US 36 Eastbound / Westbound Between Federal Boulevard and McCaslin Boulevard (Milemarker 50-52) (through December 2014)
10:00 AM-3:00 PM MO-FR, 8:00 PM-5:30 AM MO-FR TU, full closure of EB & WB US 36 under Wadsworth Parkway for bridge deck construction. Detour via on & off ramps 9p-5:30a. MO-TH, 8p-5:30a, single lane closed WB US 36 Church Ranch to Sheridan for dirt hauling operations. WE-FR, 10p-5a, only one lane open NB & SB Wadsworth for dirt hauling operations. TH, 9:30p-1a, ramp from West Flatiron to WB US 36 closed 9:30p-1a for paving. In addition, 1:30a-5:30a, ramp from Interlocken to WB US 36 closed for paving. MO-FR, 10a-3p, right lane closed WB US 36 Federal to Sheridan for wall construction. Ramp detours posted. Alternate routes advised.