8/27/14 7:02 PM (MST)
Updated 4 hours 5 minutes ago
225
  Road Construction

Severe Road Work  I-225 Southbound Between Parker Road and Mississippi Avenue (Milemarker 4-7) (through September 2014)

8:30 AM-3:30 PM TU-TH, 10:00 PM-5:30 AM SU-TH Single lane closures SB I-225 TU-TH for paving and striping. TU, single lane closure NB I-225 at 10p with a second lane closing at midnight for striping and light pole work. TU-TH, 8:30a-3:30p, right lane closed on the ramp from SB I-225 to Iliff. . Delays possible.